Proposed Development of BP 10 for the supply of material for the Mgwali South Water Supply Project – Draft Basic Assessment Report

Amathole District Municipality (ADM) are currently undertaking the construction of the Mgwali South Water Supply project in the vicinity of Dutywa in the Eastern Cape which requires the development of a borrow pit (BP10). Terreco Environmental cc has been appointed by the project engineers, Bosch Projects, to undertake the legally required application process for Environmental Authorisation (EA) including the environmental impact assessment and report which must be provided in support of the application. The public review period is set at 30 days (as per the EIA Regulations, 2014, as amended) and will run from 15 August to 16 September 2019 for this draft BAR.

All comments to be addressed to Michell Jarrett at admin@terreco.co.za

Proposed Development of BP 10 for the supply of material for the Mgwali South Water Supply Project – Draft Basic Assessment Report

Amathole District Municipality (ADM) are currently undertaking the construction of the Mgwali South Water Supply project in the vicinity of Dutywa in the Eastern Cape which requires the development of a borrow pit (BP10). Terreco Environmental cc has been appointed by the project engineers, Bosch Projects, to undertake the legally required application process for Environmental Authorisation (EA) including the environmental impact assessment and report which must be provided in support of the application. The public review period is set at 30 days (as per the EIA Regulations, 2014, as amended) and will run from 15 August to 16 September 2019 for this draft BAR. All comments to be addressed to Duncan Scott at admin@terreco.co.za

Proposed Improvement of the National Road R63 Section 15 and 16 from Bhisho (Km 5.8) to the N6 Bridge Intersection (Km 1.0). – Draft Basic Assessment Report

South African National Roads Agency SOC Ltd (SANRAL) have developed proposals for the upgrading of the Sections 15 and 16 R63 National Road between from Bhisho (km 5,8) and the R63/N6 bridge intersection (km 1,0). Terreco Environmental cc has been appointed by the project engineers, Mariswe (Pty) Ltd to undertake the legally required application process for Environmental Authorisation (EA) including the environmental impact assessment and report which must be provided in support of the application. The public review period is set at 30 days (as per the EIA Regulations, 2014, as amended) and will run from 19 July to 19 August 2019 for this draft BAR. All comments to be addressed to Mitchell Jarrett at jarrettm@terreco.co.za or faxed through to 043 721 1535.

Proposed Improvement of the National Road R63 Section 15 and 16 from Bhisho (Km 5.8) to the N6 Bridge Intersection (Km 1.0) – For the Use of Borrow Pits and Quarries– Draft Basic Assessment Report

South African National Roads Agency SOC Ltd (SANRAL) have developed proposals for the upgrading of the Sections 15 and 16 R63 National Road between from Bhisho (km 5,8) and the R63/N6 bridge intersection (km 1,0) which require the use of borrow pits and quarries. Terreco Environmental cc has been appointed by the project engineers, Mariswe (Pty) Ltd to undertake the legally required application process for Environmental Authorisation (EA) including the environmental impact assessment and report which must be provided in support of the application. The public review period is set at 30 days (as per the EIA Regulations, 2014, as amended) and will run from 19 July to 19 August 2019 for this draft BAR. All comments to be addressed to Mitchell Jarrett at jarrettm@terreco.co.za or faxed through to 043 721 1535.

Proposed Mdantsane Pedestrian Bridges, BCMM: Draft Basic Assessment Report

The Buffalo City Metropolitan Municipality (BCMM) have developed proposals to construct two high level pedestrian bridges in Mdantsane in East London. These bridges are the NU 11B – NU 12 link bridge on Erf 2466 (Ward 48) and the Sithembiso Secondary School link bridge on Erf 9678 located in NU 3 (Ward 14). The purpose of the Project is to construct pedestrian bridges at these two sites which will allow safe passage across these watercourses for pedestrians. Terreco Environmental cc has been appointed by the project engineers (Engineering Advice and Services (Pty) Ltd)), on behalf of BCMM, to undertake the legally required application process for Environmental Authorisation (EA) including the environmental impact assessment and report which must be provided in support of the application. The public review period is set at 30 days (as per the EIA Regulations, 2014, as amended) and will run from 18 July to 16 August 2019 for this draft BAR. All comments to be addressed to Mitchell Jarrett at jarrettm@terreco.co.za or faxed through to 043 721 1535.

Proposed Hewu Bulk Water Supply Scheme, Chris Hani District, Eastern Cape – Draft Basic Assessment Report

Chris Hani District Municipality (CHDM) are proposing to improve and increase water supply in the Sada region near Whittlesea, Eastern Cape. The new pipeline routes will be placed within existing pipeline routes/servitudes or within road reserves. Where possible the new pipelines are proposed to be attached to existing pipe bridges across watercourses, namely; the Oxkraal River and tributaries. As per the EIA Regulations 2014 (as amended), the public review period for this document is set at 30 days and will run from 18 July – 19 August 2019. All comments must be addressed to Miss Njabulo Mzilikazi at admin@terreco.co.za or faxed through to 043 721 1535.

Proposed Telecommunications Basestation and Mast, Dorchester Heights, East London – Final Basic Assessment Report

Atlas Tower Pty (Ltd) are proposing to construct a new telecommunications base station with 30m-high Lattice Mast on Portion 45 of Farm 816 in Dorchester Heights, East London. The proposed site lies within a critical biodiversity area. Terreco Environmental cc has been appointed by Atlas Tower to undertake the legally required application process for Environmental Authorisation supported by a Basic Assessment Report. The Final Basic Assessment Report was submitted to the Department of Economic Development, Environmental Affairs and Tourism (DEDEAT) Amathole on 12 April 2019 for their decision on Environmental Authorisation.

Proposed Telecommunications Basestation and Mast, Dorchester Heights, East London – Draft Basic Assessment Report

Atlas Tower Pty (Ltd) are proposing to construct a new telecommunications base station with 30m-high Lattice Mast on Portion 45 of Farm 816 in Dorchester Heights, East London. The proposed site lies within a critical biodiversity area. Terreco Environmental cc has been appointed by Atlas Tower to undertake the legally required application process for Environmental Authorisation supported by a Basic Assessment Report.
As per the EIA Regulations 2014 (as amended), the public review period for this document is set at 30 days and will run from 6 March – 5 April 2019. All comments must be addressed to Miss Njabulo Mzilikazi at admin@terreco.co.za or faxed through to 043 721 1535.

Proposed Riverbend Retirement Village Development, East London: Final Basic Assessment Report

Kayser Beach Trust are proposing to construct the Riverbend Retirement Village Development on Portions 1, 51, 52 and 53 of Farm 811 located off the R102 (MR00686) Road between Meisies Halt and Shafli Road (DR02730), East London. The proposals comprise of residential and a private open space area. The proposals also include the construction of internal roads within the development, the provision of services such as water, electricity and sanitation as well as stormwater management incorporated in the design plans of the development. Terreco Environmental cc has been appointed by Kayser Beach Trust to undertake the legally required application process for Environmental Authorisation including the environmental impact assessment and report which must be provided in support of the application.